Projects Transmission Gully Motorway, NZ

Transmission Gully Motorway, NZ

Civil

TWK Steel is so glad to participate in the Transmission Gully Motorway New Zealand. The Cannons Creek Bridge is by far the longest bridge to be constructed along the 27-kilometre, $850 million Transmission Gully Motorway (TGM).

TWK Steel successfully deliver Steel Launching Nose to the project. Our scope of work include:

  • Shop Drawings
  • Supply of Steel Launching Nose
  • Corrosion protection
  • Delivery to site

A trial assembly performed of the pre-fabricated steelwork in house to ensure specifications compliance prior delivery.

  • All components are correctly assembled and aligned, in accordance with the specification
  • Overall dimensions are within specification tolerances
  • Assemblies meet appropriate geometric tolerances (square, straight, angles, free from twists)
  • Completed assemblies meet specification

TWK Steel has once again well demonstrated in-depth understanding of the project requirements and deliver a challenging project for our client.

Our Other Projects

DIN 2303 | EN 15085 | Austroads CC3 | QBCC 1555372
Privacy Policy
‎ ‎ ‎ © 2026 TWK All rights reserved.