Brisbane Airport New Runway, QLD 24 Aug 2018 Brisbane Airport New Runway, QLD TWK Steel successfully complete the delivery of a permanent structural steel package for the Brisbane Airport New Runway project. Our Scope of works include: Shop Drawings Steel Fabrication Coating Site Delivery Our sophisticated project management system enable us to complete ... Read More tbadmin
Northconnex, NSW 11 Apr 2018 Northconnex, NSW Northconnex, NSW TWK Steel design and manufacture these permanent steel noise wall posts as part of the NorthConnex project. TWK Steel require to meet strict quality guidelines in line with Australian standards to ensure the longevity of our materials and ... Read More tbadmin
11 Apr 2018 CityLink Tulla Road Widening, VIC CityLink Tulla Road Widening, VIC With Melbourne’s population growing faster than ever, a number of key projects are underway across the region to support the need for improved road access. One key project is the Citylink Tulla widening project which ... Read More tbadmin
11 Apr 2018 Transmission Gully Motorway, NZ Transmission Gully Motorway, NZ TWK Steel is so glad to participate in the Transmission Gully Motorway New Zealand. The Cannons Creek Bridge is by far the longest bridge to be constructed along the 27-kilometre, $850 million Transmission Gully Motorway (TGM). TWK Steel ... Read More tbadmin
11 Apr 2018 Westconnex, NSW Westconnex, NSW The New M5 will provide twin underground motorway tunnels, nine kilometres long, from Kingsgrove to a new St Peters Interchange at the site of the old Alexandria landfill facility. The New M5 tunnels will be marked for two ... Read More tbadmin
11 Apr 2018 Richmond River Bridge, NSW Richmond River Bridge, NSW TWK Steel successfully deliver Steel Formwork to the Richmond River Bridge Project. Our scope of work include Supply, Design and Steel Fabrication for the project At 980 metres long, the new bridge over the Richmond River ... Read More tbadmin
23 Mar 2018 Green Square Community Centre, NSW TWK Steel successfully deliver structural steel to the Green Square Community Centre Project. Our scope of work include Supply, Steel Fabrication of Permanent Structural Steel and deliver for the project. Any Question at(02) 9744 1369Burwood AddressUnit 17 Level 2 / 12 ... Read More tbadmin
01 Mar 2018 Deakin University Pedestrian Bridge, VIC TWK Steel worked with contractors to produce an environmentally conscious and complimentary steel finish for this 245m long pedestrian bridge. Overcoming strict budget controls and the need to have minimal impact on the surrounding environment, both during and after construction, TWK ... Read More tbadmin
23 Jan 2018 Iron Cove Bridge Duplication, NSW TWK Steel successfully deliver steel launching nose for the Iron Cove Bridge Duplication project. Our scope of work include supply, steel fabrication and deliver to site. The bridge located on the western side of the existing bridge, the new bridge ... Read More tbadmin
11 Jan 2018 Gateway, WA Gateway, WA TWK Steel are proud of our role in assisting key contractors to deliver the Gateway WA project, on time and on budget. Completed in 2016, the project was the largest road project undertaken in Perth to date, at ... Read More tbadmin