Westconnex, NSW
The New M5 will provide twin underground motorway tunnels, nine kilometres long, from Kingsgrove to a new St Peters Interchange at the site of the old Alexandria landfill facility. The New M5 tunnels will be marked for two lanes in each direction, with capacity to add a third and also include underground connection points for the M4-M5 Link and the proposed F6 Extension.
TWK Steel successfully deliver Steel Formwork to the project. Scope of work include Design, Steel Fabrication, Certification and Delivery of column formwork.